Search and Rescue Robot (SaRR)

  • Coursework
  • Robotics
  • Leadership

On a large team, I developed a Search and Rescue Robot (SaRR) designed to navigate and traverse difficult environments and deliver a specific payload to a specified target. The SaRR was capable of navigating a 15 degree incline, breaching a 1 foot wall, and delivering a payload via closed loop sensor detection. Additionally, all parts were designed, machined and programmed by the team and the fundamental design was completely novel from all robots developed during the 15-year-running course.

Role
Appointed lead and project manager of an eleven person design team; lead project management, group communication and cross-team manufacturing. Involved in electrical design and implementation, as well as testing.
Team
Team of 11
Course
MAE 322 Mechanical Design
Tools
CREO, Lathe, Mill, General Metal Machining, CAN Communication, DC CIM Motors, 3D Printing, Project Management, Kanban
  • 11person team
  • 8week project
  • 2robots, one carrying the other
  • 1 ftwall breached
01

Background

As part of MAE 322: Mechanical Design with Professor Daniel Nosenchuck, I worked in a group of 11 people on an 8-week project to design, manufacture, and automate a Search-and-Rescue-Robot (SaRR) capable of surviving a 1-foot drop test, tracking via light, navigating a 3-foot wide ramp and chute, breaching a 1-foot high wall, and delivering a rescue payload to a randomly selected drop point. The course featured few requirements for design, allowing a high degree of creativity.

02

General Design

03

Timeline

  1. 01

    Week 1–4: Machine Shop Training

    Time spent building a practice robot to teach us fundamentals of machine shop fabrication, including 3D Printing, CNC Machining, Laser Cutting, Milling, and using Lathes.

  2. 02

    Week 5–6: Brainstorming and Design

    Brainstorming focused on feasibility, reliability, and uniqueness. Initial designs were CADed in Creo and iterated aggressively through prototyping and failure. Our project motto was “Fail fast and fail forward!” We also took this time to set a semester-long timeline according to an Agile model.

    Decision matrix.
    Decision matrix.
  3. 03
  4. 04

    Week 8–10: Electrical and Software

    Both robots used their own Teensy 4.1. Schematics, wiring harnesses, and software were built in parallel with manufacturing to enable rapid integration. Each robot had its own unique sensor arrays and power requirements.

  5. 05

    Week 11–12: Testing and Debugging

    In the last two weeks before the deadline, we hit the ground running with rapid testing and debugging. The goal was to identify and fix any issues through sheer volume of repetition, and the robots successfully fully completed the course during testing by the final day. Some key fixes included rebuilding the pulley shaft attached to the BabyBot extension mechanism, adding spacers to the wheels to stop the belt drive from grinding into them, tuning BabyBot’s payload launcher’s spring tension, and integrating recalibration code into the sensor systems to allow for automated calibration at different light levels.